Questions, answered plainly.
Working with us
Is the consultation free?
Yes. Consultations are free, either at your property or at the design studio in downtown Austin.
How much will my remodel cost?
It depends on the size of the space, the design and the finishes you choose, so prices aren't quoted before the team understands the project. You'll get a clear plan before any work begins.
Where is the design studio?
At 1601 E 5th St, Suite 101, Austin, TX 78702, just east of downtown. Visits are by appointment.
What areas do you serve?
Austin and the surrounding area, within about 40 miles of downtown: Round Rock, Cedar Park, Georgetown, Pflugerville, Leander, Lakeway, Bee Cave, Dripping Springs, Buda, Kyle, San Marcos and more.
What are your hours?
Consultations are by appointment, Monday to Saturday, 8am to 7pm.
Do you build new homes and ADUs?
Yes: custom homes, new construction and ADUs. The design studio is the best place to start when there's no house to see yet.
Are there benefits to using you for design and construction?
Yes. Clients who choose Lifestyle Designs & Remodeling for both design and construction on a kitchen, bathroom or addition receive exclusive Design + Build incentives. The team explains them at your consultation.
Planning a remodel or new build
What is design-build, and how is it different from hiring a designer and a contractor?
Design-build means one company handles both the design and the construction under one agreement. With the traditional route, you hire a designer or architect, then take the plans out to contractors to price and build.
What changes with design-build:
- One point of accountability, instead of a designer and a builder who can each point at the other.
- Construction knowledge shapes the design early, so the plan is buildable and selections are realistic.
- Selections and ordering can start during design, which helps the schedule.
At Lifestyle Designs & Remodeling, every client works with a dedicated designer and a project manager from start to finish.
Do I need a permit to remodel in Austin?
Often, yes. Work that changes structure, adds space, or alters plumbing, electrical or mechanical systems usually needs a permit from the city where the home is, such as the City of Austin's Development Services Department, Round Rock or Cedar Park. Purely cosmetic work like painting or replacing a countertop in place usually does not.
Rules differ by city and change over time, so permit needs are confirmed for your specific project during design.
How long does a remodel take?
It depends on the size of the project, how many selections are made up front, and permit and inspection timing. That's why timing is discussed at your consultation rather than quoted in general.
The single biggest thing you can do to keep a remodel on schedule is make selections early. Cabinets, specialty tile and fixtures with long lead times should be ordered before demolition.
Can we live in the house during a remodel?
Often, yes, for a single room or a phased project. A kitchen remodel usually means setting up a temporary kitchen elsewhere in the house. For a whole-home remodel, especially with structural work or work on the only bathroom, many families move out for part or all of it.
Phasing and dust control are planned with you before construction starts.
What should I bring to a design consultation?
Anything that helps the team see what you see:
- Photos or saved ideas of spaces you like (and ones you don't).
- A list of what isn't working in the space today.
- Any plans, surveys or HOA guidelines you already have.
- A rough budget range and when you hope to start or finish.
For new construction or an ADU, bring what you know about the lot: address, survey and any restrictions.
How do Central Texas soils affect additions and new homes?
A lot. Much of the land east of I-35 is expansive clay that swells when wet and shrinks in drought, which moves foundations. West of I-35, toward the Hill Country, many lots sit on shallow limestone that's hard to dig.
New foundations are designed for the soil they sit on, often with a geotechnical report and an engineer. It is a design question to settle before construction, not during it.